| My 69 Grand Prix Restoration - 30 |
|---|
July 25, 2001
After work today, I went over to Bob's shop and loaded up my motor, to take home. Wouldn't you know, we we would have a major downpour!! The lightning was great!! Got it home, and let it sit in my Blazer overnight.
July 26, 2001
Glad the cold front made it through! I was able to unload her from my truck and get the motor
mounted on the stand.
![]() |
July 27, 2001
Took the day off from work! I got the whole motor all buttoned up today! I finished the night
out by getting the motor off the stand and mounted to the engine crane.
![]() |
![]() |
July 28, 2001
This morning, along with my son Chris, I got the flywheel, pressure plate and clutch mounted to
the motor.
![]() |
After getting the tranny and the Headers mounted, which are "ole" Blackjack 3 tube, she is ready
to go in!
![]() |
![]() |
![]() |
Spent the rest of the day, bolting and installing. Called it a day around 9:30pm! Still need
to bolt up the starter, clutch linkage, 3 speed hurst shifter, driveshaft, and exhaust.
![]() |
July 29, 2001
Well, today I managed to finish the install. I got the driveshaft up, clutch linkage, the
flowmaster exhaust hooked up to the headers, speedometer cable, hurst shift linkage, and then
installed the distributor and wires. Added the rest of the oil, and filled her up with water.